{"id":94127,"date":"2024-01-16T13:24:26","date_gmt":"2024-01-16T12:24:26","guid":{"rendered":"https:\/\/eiposgrados.com\/?p=94127"},"modified":"2024-01-16T13:24:37","modified_gmt":"2024-01-16T12:24:37","slug":"bp-transaction-in-sap-s-4-hana-fiori-3","status":"publish","type":"post","link":"https:\/\/eiposgrados.com\/eng\/consultor-sap\/fases-de-un-proyecto-sap\/","title":{"rendered":"The Phases of a SAP project: 5 key steps"},"content":{"rendered":"<h2 class=\"wp-block-heading\"><strong>Phases of a SAP project<\/strong><\/h2>\n\n\n\n<p><strong>Have you ever wondered how a SAP project is carried out from its foundation to its successful deployment?<\/strong> You&#039;ve come to the right place!<\/p>\n\n\n\n<p>In this article, we will break down the phases of a <strong>project <a href=\"https:\/\/www.sap.com\/spain\/index.html\" data-type=\"link\" data-id=\"https:\/\/www.sap.com\/spain\/index.html\" target=\"_blank\" rel=\"noreferrer noopener\">SAP<\/a><\/strong> in a direct and pleasant manner.<\/p>\n\n\n\n<p>Leave boring technical jargon behind and join us as we unravel the process in 5 exciting steps. From the preparation phase, where everything takes shape, to the exciting &quot;Go Live&quot; moment when SAP comes to life in your company.<\/p>\n\n\n\n<p>Once the project has been offered and awarded, they usually have a few <strong>5 common phases<\/strong>:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>1. Starting the Engines! Project Preparation<\/strong><\/h2>\n\n\n\n<p>In the first meetings the <strong>initial planning<\/strong>, organization of the infrastructure, the scope of the project, the personnel we have available to develop it, both on the consultant&#039;s side and on the client&#039;s side (resources).<\/p>\n\n\n\n<p>Typically, this has been discussed at a higher level in client pitch meetings, but here it&#039;s often brought down to earth and the first and last names of each role are discussed.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/las-fases-de-un-proyecto-sap-5-pasos-clave-1024x683.jpg\" alt=\"The Phases of a SAP Project: 5 Key Steps\" class=\"wp-image-94166\" title=\"\" srcset=\"https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/las-fases-de-un-proyecto-sap-5-pasos-clave-1024x683.jpg 1024w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/las-fases-de-un-proyecto-sap-5-pasos-clave-300x200.jpg 300w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/las-fases-de-un-proyecto-sap-5-pasos-clave-768x512.jpg 768w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/las-fases-de-un-proyecto-sap-5-pasos-clave-248x165.jpg 248w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/las-fases-de-un-proyecto-sap-5-pasos-clave-123x82.jpg 123w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/las-fases-de-un-proyecto-sap-5-pasos-clave-18x12.jpg 18w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/las-fases-de-un-proyecto-sap-5-pasos-clave-500x333.jpg 500w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/las-fases-de-un-proyecto-sap-5-pasos-clave-800x533.jpg 800w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/las-fases-de-un-proyecto-sap-5-pasos-clave-1280x853.jpg 1280w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/las-fases-de-un-proyecto-sap-5-pasos-clave-200x133.jpg 200w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/las-fases-de-un-proyecto-sap-5-pasos-clave.jpg 1500w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p><strong>Schedules are established<\/strong> on a high-level scale for each project phase, to see possible dates, depending on the work to be done... There are multiple tools for organizing these calendars, where tasks are linked together, etc. This type of organization is important for meeting milestones within the project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2. Business blueprint<\/strong><\/h2>\n\n\n\n<p>It&#039;s time to get down to business. <strong>We outline the necessary flows according to the company&#039;s needs and capture them in a master document.<\/strong>No more boring contracts, this is the master guide. Each area breaks down the flows we&#039;ve defined with the client. Everything is verified: documents, schedules, GAP, project scope, developments, interfaces...<\/p>\n\n\n\n<p>In this phase we will have to land <strong>How business processes will be developed in the SAP environment<\/strong>The result will be a detailed &quot;how to&quot; documentation. This document is drafted and approved by both parties. It&#039;s like a contract for what will be assembled and how.<\/p>\n\n\n\n<p>In the first meetings the <strong>initial planning<\/strong>, organization of the infrastructure, the scope of the project, the personnel we have available to develop it, both on the consultant&#039;s side and on the client&#039;s side (resources).<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/fases-de-un-proyecto-sap-1-1024x683.jpg\" alt=\"Phases of a SAP Project\" class=\"wp-image-94167\" title=\"\" srcset=\"https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/fases-de-un-proyecto-sap-1-1024x683.jpg 1024w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/fases-de-un-proyecto-sap-1-300x200.jpg 300w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/fases-de-un-proyecto-sap-1-768x513.jpg 768w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/fases-de-un-proyecto-sap-1-247x165.jpg 247w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/fases-de-un-proyecto-sap-1-123x82.jpg 123w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/fases-de-un-proyecto-sap-1-18x12.jpg 18w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/fases-de-un-proyecto-sap-1-500x334.jpg 500w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/fases-de-un-proyecto-sap-1-800x534.jpg 800w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/fases-de-un-proyecto-sap-1-1280x854.jpg 1280w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/fases-de-un-proyecto-sap-1-200x133.jpg 200w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2024\/01\/fases-de-un-proyecto-sap-1.jpg 1500w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\"><strong>3. <\/strong>\u00a1<strong>Making It Real! Realize<\/strong><\/h2>\n\n\n\n<p>Time to build! <strong>Master data, interfaces, developments, business parameterization on the machine<\/strong>We do this in this step.<\/p>\n\n\n\n<p>Depending on the project and its magnitude, small waves or Sprints are usually made to advance the steps taken to the client and to verify them with small-scale changes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>4. Last Call! Final Preparation<\/strong><\/h2>\n\n\n\n<p>Final preparation is understood as the development of these manuals adapted to the processes that the company itself has in its system, <strong>definition of Roles<\/strong>Training for key users or directly for end users. Test environments with real-life cases to observe behavior and make specific adjustments for specific cases.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>5. Go Live! Productivity and Support<\/strong><\/h2>\n\n\n\n<p>The big day has arrived! <strong>We activate the production environment and SAP begins to shine.<\/strong><\/p>\n\n\n\n<p>The production environment is activated and SAP begins operating on the selected date. The consulting firm provides support to the end users previously agreed upon in the bid or during project preparation. <strong>Go Live<\/strong> in terms of consulting.<\/p>\n\n\n\n<p>In this phase, master data has been loaded, the company is operational, and the full accounting and logistics period is open.<\/p>\n\n\n\n<p>These steps normally <strong>They are usually done at night so as not to interrupt business activity.<\/strong> and it usually coincides with the end of the month or weekend so that it can be carried out in an orderly manner and with a specific strategy.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Discover our SAP training<\/strong><\/h2>\n\n\n\n<p>We have our&nbsp;<strong><a href=\"https:\/\/eiposgrados.com\/eng\/programs\/master-sap-financial-consultant-companies\/\">Master in Financial Management and Functional Consulting SAP S\/4HANA Finance<\/a><\/strong>,&nbsp;<strong><a href=\"https:\/\/eiposgrados.com\/eng\/certification\/sap-s-4hana-sp-certificate\/\">Official Sap S\/4Hana Sourcing And Procurement Certificate<\/a><\/strong>&nbsp;and&nbsp;<strong><a href=\"https:\/\/eiposgrados.com\/eng\/certification\/sap-s-4hana-official-certificate\/\">Sap S\/4Hana Finance Official Certificate<\/a><\/strong>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Phases of a SAP project Have you ever wondered how a SAP project is carried out from its foundations to its successful deployment? \u2026 <a title=\"The Phases of a SAP project: 5 key steps\" class=\"read-more\" href=\"https:\/\/eiposgrados.com\/eng\/consultor-sap\/fases-de-un-proyecto-sap\/\" aria-label=\"Read more about The Phases of a SAP project: 5 key steps\">Read more<\/a><\/p>","protected":false},"author":103,"featured_media":94156,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[1195],"tags":[],"class_list":["post-94127","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-consultor-sap"],"acf":[],"_links":{"self":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/posts\/94127","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/users\/103"}],"replies":[{"embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/comments?post=94127"}],"version-history":[{"count":0,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/posts\/94127\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/media\/94156"}],"wp:attachment":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/media?parent=94127"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/categories?post=94127"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/tags?post=94127"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}