{"id":34433,"date":"2021-05-25T10:57:46","date_gmt":"2021-05-25T08:57:46","guid":{"rendered":"https:\/\/eiposgrados.com\/?p=34433"},"modified":"2021-05-25T11:20:21","modified_gmt":"2021-05-25T09:20:21","slug":"personnel-for-three-photovoltaic-plants","status":"publish","type":"post","link":"https:\/\/eiposgrados.com\/eng\/energy-blog\/personnel-for-three-photovoltaic-plants\/","title":{"rendered":"Soltec begins the personnel selection process for three photovoltaic plants"},"content":{"rendered":"<p>He <strong>Renewable Energy Sector<\/strong> continues to grow. Between <strong>M\u00e9rida and Almendralejo<\/strong> Personnel are needed for three photovoltaic plants that will be built throughout this year. <\/p>\n\n\n\n<p>The company <strong>Soltec Renewable Energies<\/strong> aims to incorporate into its three photovoltaic plants a total of <strong>450 workers<\/strong> commissioned by ENEL (Endesa). <\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/eiposgrados.com\/wp-content\/uploads\/2021\/05\/personal-para-plantas-fotovoltaicas-1024x682.jpg\" alt=\"\" class=\"wp-image-34449\" width=\"621\" height=\"413\" title=\"\" srcset=\"https:\/\/eiposgrados.com\/wp-content\/uploads\/2021\/05\/personal-para-plantas-fotovoltaicas-1024x682.jpg 1024w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2021\/05\/personal-para-plantas-fotovoltaicas-300x200.jpg 300w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2021\/05\/personal-para-plantas-fotovoltaicas-768x512.jpg 768w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2021\/05\/personal-para-plantas-fotovoltaicas-1536x1023.jpg 1536w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2021\/05\/personal-para-plantas-fotovoltaicas-2048x1365.jpg 2048w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2021\/05\/personal-para-plantas-fotovoltaicas-248x165.jpg 248w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2021\/05\/personal-para-plantas-fotovoltaicas-190x126.jpg 190w, https:\/\/eiposgrados.com\/wp-content\/uploads\/2021\/05\/personal-para-plantas-fotovoltaicas-scaled.jpg 1920w\" sizes=\"(max-width: 621px) 100vw, 621px\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Information to sign up for the job offer<\/h2>\n\n\n\n<p>Julio C\u00e9sar Fuster, the Human Resources Delegate, has communicated that those interested in signing up for this job offer and being part of this project must send their resume along with their photograph to the email <strong>employment.sanservan@soltec.com. <\/strong><\/p>\n\n\n\n<p>You must communicate a code that appears on your <a href=\"https:\/\/www.almendralejo.es\/\" class=\"rank-math-link\" target=\"_blank\" rel=\"noopener\">Web<\/a> and express to the job that they want to access and only if they meet the necessary requirements. Some of the <strong>aspects that will be valued <\/strong>they will be: <\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>The <strong>possession of construction professional card<\/strong>.<\/li><li><strong>Occupational prevention courses<\/strong> in the metal carpentry categories.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Positions offered<\/h2>\n\n\n\n<p>The different jobs offered for these three photovoltaic plants are <strong>assembly assistants, light machine manipulators, electrical positions<\/strong> and positions<strong> supervisory line assemblers. <\/strong><\/p>\n\n\n\n<p>In turn, due to the generation of these jobs, others are generated indirectly for which resumes are also accepted, such as <strong>administrative assistants, administrative assistants, mayor, warehouse assistant, cleaning assistants, quality technicians, receptionists and human resources assistants. <\/strong><\/p>\n\n\n\n<p>Fountain: <a href=\"https:\/\/elperiodicodelaenergia.com\/soltec-incorporara-a-450-trabajadores-para-la-instalacion-de-tres-plantas-fotovoltaicas\/amp\/\" class=\"rank-math-link\" target=\"_blank\" rel=\"noopener\">The Energy Newspaper.<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Soltec Energ\u00edas Renovables needs personnel for three photovoltaic plants between M\u00e9rida and Almendralejo. Do you want to know what positions they are? We tell you!<\/p>","protected":false},"author":103,"featured_media":34450,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[175],"tags":[],"class_list":["post-34433","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog-energias"],"acf":[],"_links":{"self":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/posts\/34433","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/users\/103"}],"replies":[{"embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/comments?post=34433"}],"version-history":[{"count":0,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/posts\/34433\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/media\/34450"}],"wp:attachment":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/media?parent=34433"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/categories?post=34433"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/tags?post=34433"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}