{"id":20018,"date":"2020-11-28T13:51:52","date_gmt":"2020-11-28T12:51:52","guid":{"rendered":"https:\/\/eiposgrados.com\/?p=20018"},"modified":"2021-03-16T13:26:10","modified_gmt":"2021-03-16T12:26:10","slug":"informationbim_cde","status":"publish","type":"post","link":"https:\/\/eiposgrados.com\/eng\/blog-ingenieros\/informacionbim_cde\/","title":{"rendered":"How do we share information in BIM?"},"content":{"rendered":"<p>Just as we talked in the <a href=\"https:\/\/eiposgrados.com\/eng\/without-category\/work-collaboratively\/\">last post<\/a>, the <a href=\"https:\/\/eiposgrados.com\/eng\/engineers-blog\/bim\/\"><strong>BIM (Building Information Modeling) methodology&nbsp;<\/strong><\/a>It is a collaborative work methodology for&nbsp;<strong>creation and management of a 3D model<\/strong>&nbsp;in a construction or infrastructure project, and its main objective is <strong>centralize information<\/strong> generated <strong>in a single digital model<\/strong> created and shared by all agents involved in a project.<\/p>\n<p>To develop a project under BIM methodology, information and data exchange must be managed in a structured and secure way. This requires the use of a <strong>CDE, <em>Common Data Environment<\/em> o Common Data Environment<\/strong>, a common digital space where everyone can access and incorporate or modify information appropriately.<\/p>\n<p>Normally, this database will be the property of the client, although the client does not always provide or specify the CDE to be used, in which case delegating the definition usually to the designer, in this case it will be the <a href=\"https:\/\/eiposgrados.com\/eng\/engineers-blog\/bim-project-manager\/\">BIM Project Manager<\/a> (or if there is one, the Information Manager) who is in charge of making decisions.<\/p>\n<h1 class=\"head-post-title\">COMMON DATA ENVIRONMENT<\/h1>\n<div class=\"line\">\n<div class=\"line-inside\">As its name suggests, a CDE (<em>Common Data Environment<\/em> ) o Common Data Environment is a space for digital collaboration, we usually place it in the cloud so that all agents can access its content from their workplace. All project information is stored securely in it, and all members of the Work Team have access to make reviews or modifications according to their role. The use of this management tool improves security, reduces the risk of duplication of information and lack of communication.<\/div>\n<\/div>\n<p>In summary, its functions are the following:<\/p>\n<p>\u00b7 The CDE must be the <strong>sole source<\/strong> of project information.<\/p>\n<p>\u00b7 Is used for <strong>collect, manage and disseminate documentation<\/strong>, models and non-graphical data for the entire Work Team.<\/p>\n<p>\u00b7 Within it we will find the project information, in formats linked to the BIM methodology (.ifc, .rvt) and\/or in conventional formats (.xls, .pdf, .html).<\/p>\n<p>\u00b7 The<strong> agents in charge<\/strong> to centralize and manage information.<\/p>\n<p>\u00b7 He <strong>access<\/strong> to the information of a project must be <strong>restricted<\/strong> to the agents defined in the BEP.<\/p>\n<p>\u00b7 Access will be done through permissions and <strong>user control<\/strong>.<\/p>\n<p>\u00b7 Must be <strong>define and structure<\/strong> a series of folders and <strong>directories<\/strong> to work in an orderly manner. It will be carried out for each project, in the BIM Execution Plan.<\/p>\n<p>\u00b7 In it<strong> BIM Execution Plan<\/strong>, (coordinated by the BIM Manager) your <strong>structure<\/strong>, the <strong>strategy<\/strong> of work, <strong>milestones<\/strong> of information exchange, its <strong>frequency<\/strong>, and the ways of reporting information and <strong>notifications<\/strong> to the different agents.<\/p>\n<p>\u00b7 He <a href=\"https:\/\/eiposgrados.com\/eng\/engineers-blog\/bim_manager\/\">BIM Manager<\/a> must ensure the <strong>CDE maintenance and integrity<\/strong>&nbsp; and in particular the model for which it is responsible. You must make backup copies at appropriate intervals.<\/p>\n<p>&nbsp;<\/p>\n<h2>Reference rules<\/h2>\n<p>For the organization of the CDE, we base ourselves on standards for the organization and digitization of information in building and civil engineering works:<\/p>\n<p><strong>UNE-EN ISO 19650-1 Part 01<\/strong>: Concepts and Principles<\/p>\n<p><strong>UNE-EN ISO 119650-2 Part 02:<\/strong> Asset development phase.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>How do we share information in BIM? We tell it to you in our blog. Come in and find out!<\/p>","protected":false},"author":26,"featured_media":20019,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[176],"tags":[],"class_list":["post-20018","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog-ingenieros"],"acf":[],"_links":{"self":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/posts\/20018","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/comments?post=20018"}],"version-history":[{"count":0,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/posts\/20018\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/media\/20019"}],"wp:attachment":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/media?parent=20018"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/categories?post=20018"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/tags?post=20018"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}