{"id":15862,"date":"2020-07-10T10:37:38","date_gmt":"2020-07-10T08:37:38","guid":{"rendered":"https:\/\/eiposgrados.com\/?p=15862"},"modified":"2021-02-11T13:23:46","modified_gmt":"2021-02-11T12:23:46","slug":"bim","status":"publish","type":"post","link":"https:\/\/eiposgrados.com\/eng\/blog-ingenieros\/bim\/","title":{"rendered":"And you, when do you switch to BIM?\u00a0"},"content":{"rendered":"<p>We are still asked the question of why the BIM methodology improves construction processes.<\/p>\n<p><b>building<\/b> <b>Information<\/b> <b>Modeling<\/b><b> (BIM)<\/b> It is a work methodology <strong>collaborative<\/strong> for the creation and management of a construction project. Its objective is to centralize all project information in one <strong>digital information model<\/strong> created by all its agents.<\/p>\n<p>BIM represents the evolution of traditional design systems based on the plan, since it incorporates geometric (3D), time (4D), cost (5D), environmental (6D) and maintenance (7D) information.<\/p>\n<p>The use of BIM goes beyond the design phases, covering the execution of the project and extending throughout the life cycle of the building, allowing its management and reducing operating costs.<\/p>\n<p>Among the advantages of this work methodology, we find:<\/p>\n<p>\u00b7 Management of the entire life cycle of the asset (both in building and civil works).<\/p>\n<p>\u00b7 Single repository with <strong>all the information<\/strong> (orderly, coordinated and coherent).<\/p>\n<p>\u00b7 We went from a short-term and union vision to a long-term vision <strong>long term<\/strong> and multidisciplinary.<\/p>\n<p>\u00b7 Improves the quality of projects (technical and social aspects).<\/p>\n<p>\u00b7 Risk reduction.<\/p>\n<p>\u00b7 Feasibility analysis.<\/p>\n<p>\u00b7 Improvement of the <strong>communication<\/strong> between agents.<\/p>\n<p>\u00b7 Improvements in <strong>Estimation of deadlines and costs.<\/strong><\/p>\n<p><em>\u00b7 <\/em><em>Pre-construction<\/em> in a virtual environment and\/or digital data collection.<\/p>\n<p>\u00b7 Interoperability. Use of various computer programs for specialized work.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>And you, when do you switch to BIM?<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Building Information Modeling (BIM) is a collaborative work methodology for the creation and management of a construction project.<\/p>","protected":false},"author":26,"featured_media":15865,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[176],"tags":[],"class_list":["post-15862","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog-ingenieros"],"acf":[],"_links":{"self":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/posts\/15862","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/comments?post=15862"}],"version-history":[{"count":0,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/posts\/15862\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/media\/15865"}],"wp:attachment":[{"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/media?parent=15862"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/categories?post=15862"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eiposgrados.com\/eng\/wp-json\/wp\/v2\/tags?post=15862"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}